Do not shop, six
● The floor is not dry (wet), not clean
● surroundings termites
● cross-mixing of the construction site job
● poor quality, pollution, moisture, perishable materials keel
● The construction period is too short, can not be implemented process
● user requirements absolutely flat, no color
2, the construction requirements and fixed keel
● project before you moisture, pest control treatment, first sprinkle insect powder, holes and moisture-proof paper (film).
● keel laying the keel and accessories must be dry, not poor quality, pollution, moisture, perishable, easy infestation material for keel accessories, or not construction.
● plywood (thick plywood) laying plywood thickness 9mm over plywood best anti-corrosion paint preservative treatment, leaving about 20mm of clearance between each block of plywood, and nailed it on the ground.
3, floor coverings
● overall test shop: the deployment of the floor color. The pattern shades close to the floor in the living room, hallway or obvious at slightly different on under furniture or corner of a view to the overall aesthetic coordination.
● flooring between the floor and the walls set aside more than 8-12mm expansion joints, leaving expansion joints between the floor and the floor according to local conditions, generally 0.2-0.6mm. In the dry northwest, north and northeast China, the floor general natural Flatten the best.
● laying flooring needs nailing into the diagonal floor dedicated nail.
4, the pavement after acceptance
● usually within 3 days after the end of the floor installation and acceptance
● floor surface should be clean and smooth. Floor appearance quality to meet the requirements of the appropriate product standard.
● patchwork floor boards in adjacent rows long 1/2 or 1/3.
● laying on the floor should be solid, not loose, no abnormal noise stampede.